The westbound U.S. 50 bridge over us 301 in Queenstown, Md., is down to one lane due to construction. Drivers should avoid that route.
Half of the bridge is demolished to be rebuilt this winter, so there is no way to quickly open up a lane. Backups were bad in September with shore events and this may be worse.
Most Popular
-
(11,040)
DelDOT: New Five Points roundabout...
-
(6,137)
Ames thrived outside Rehoboth for...
-
(5,879)
Rehoboth commissioners silent on new...
-
(4,841)
Seaford man dies following hit-and-...
-
(4,690)
Rehoboth Beach man dies following...
-
(3,930)
Nichole Whitehead Harlow, human...
-
(3,869)
Industry insiders: Taylour Tedder’s...
-
(3,658)
Lincoln man charged in Georgetown...
-
(3,486)
Rehoboth Beach Patrol project facing...
-
(3,425)
Notable demos in Rehoboth Beach...
Most Popular
-
(11,040)
DelDOT: New Five Points roundabout...
-
(6,137)
Ames thrived outside Rehoboth for...
-
(5,879)
Rehoboth commissioners silent on new...
-
(4,841)
Seaford man dies following hit-and-...
-
(4,690)
Rehoboth Beach man dies following...
-
(3,930)
Nichole Whitehead Harlow, human...
-
(3,869)
Industry insiders: Taylour Tedder’s...
-
(3,658)
Lincoln man charged in Georgetown...
-
(3,486)
Rehoboth Beach Patrol project facing...
-
(3,425)
Notable demos in Rehoboth Beach...